This project involved the replacement of dated shower and toilet facilites at y Vanner Caravan Site at Llanelltud (http://www.vanner.co.uk/). The new block is modern and spacious and have been very popular with return visitors to the site. The design includes large sliding doors that are used to completely close off the facilites while the site is closed over the winter months, but when opened, fully reveal the central core of the building to welcome users, and provide views out from the sheltered canopy area. The construction work was completed over the 'off season', with the old structure demolished in November 2009 and the new building fully operational by the summer.
)